In Sardinia, Italian bureaucracy comes with regional laws that are among the strictest in Europe. What changes for buyers from abroad and what to check before signing.
Buyers arriving from Munich, London or New York who have already bought a home in Tuscany or on Lake Como often think they know the rules. In Sardinia that is not the case. On top of Italian bureaucracy, already complex for a foreigner, come regional laws on planning and landscape that are among the strictest in Europe, and that sometimes say the opposite of national ones.
This guide explains what changes and what to check before signing.
First, Italian bureaucracy
To buy a home in Italy a foreigner needs an Italian tax code (codice fiscale), which can be requested from the Revenue Agency or a consulate. Buyers from outside the European Union must also check the so-called reciprocity condition: they can buy if their country allows Italians to do the same.
A purchase usually goes through two stages. The first is the preliminary contract (compromesso), in which the parties commit and the buyer pays a deposit. The second is the deed (rogito) signed before a notary, which transfers ownership. If the buyer does not speak Italian, an interpreter is required at the deed.
There is one point many foreigners discover too late. The notary checks that the deed is valid, but does not verify that the house matches the plans approved by the municipality. By law the deed must cite the building permit, and the seller must declare that the land-registry floor plan matches the actual state of the property. Yet a veranda enclosed without a permit or an extension never authorised can pass to the new owner together with the house. From that moment they are the new owner’s problem.
That is why, in our view, it is essential to choose a local notary. It is true that the notary does not directly check planning and land-registry compliance, but they always ask the seller’s surveyor for a report confirming the property’s compliance. A notary from Milan, relying on a surveyor from Milan, may miss details that matter here. A simple example: in Sardinia a parking space created within the plot of a villa does not have to be registered as a separate parking unit. Someone who does not know this may report a perfectly regular situation as an irregularity, or, conversely, miss a real problem.
For second homes, taxes are generally calculated on the land-registry value rather than the price paid. Registration tax is 9%, falling to 2% if the buyer moves their residence to the municipality within eighteen months.
Then Sardinia: a region that makes its own laws
Sardinia is a region with special statute and has primary legislative power over planning. In 2006 it was the first Italian region to approve a Regional Landscape Plan, which strictly protects the coastal strip, precisely the areas where the prime market is concentrated.
The result is that many rules that apply in the rest of the country do not apply here, or apply differently. Some concrete examples:
| Topic | Rest of Italy | Sardinia |
|---|---|---|
| Within 300 metres of the sea | Landscape constraint: building is possible with an authorisation | Building ban (Regional Law 45 of 1989) |
| Country house | Rules set by individual municipalities and regions | Dwelling allowed only if linked to a productive farm, on a plot of at least 1 hectare (3 hectares in the coastal strip where the municipal plan has not been updated) |
| Minimum size of a studio flat | 20 square metres since 2024 (Salva casa decree) | Still 28 square metres |
| Rooms with ceilings below 2.70 metres | Can be regularised under certain conditions (Salva casa) | The Region has not adopted this option |
| Municipal master plan | Generally up to date | Many municipalities are still aligning it with the Landscape Plan |
Rules that change while you buy
In Sardinia the rules change often, and not always for good. In 2025 the Region adopted only part of the national Salva casa decree, through Regional Law 18. The Government challenged it, and on 21 May 2026 the Constitutional Court struck down several parts of it. Among them were the rule that treated the creation of new volume within the existing building outline as a renovation, and some rules on departures from approved plans. Anyone who had based a purchase or a project on those rules had to redo their sums.
Municipal plans are also in flux. In La Maddalena the alignment of the master plan with the Landscape Plan was approved in February 2026, after five and a half years of work. In Arzachena, the municipality of Porto Cervo, the 1980s building programme (Programma di Fabbricazione) is still in force. The new municipal master plan was adopted in August 2024 and, after 511 objections, readopted in June 2025, but has not yet been finally approved. In the meantime every project must comply with both the old rules and those of the new plan. In Palau, where Porto Rafael is located, the old building programme still applies: the new plan adopted years ago was withdrawn in 2020 because it was not consistent with the Landscape Plan, and a new one is being drafted. Until a municipality completes the alignment, the stricter rules of the Landscape Plan apply near the sea.
Not even a permit already granted is an absolute guarantee. In Porto Cervo the Mandarin Oriental project, announced with a €40 million investment, stopped in 2024 when the Municipality of Arzachena declared the building permit lapsed because works had started late and then been interrupted.
What to check before signing
- Planning compliance: compare the actual state of the house with all the building permits filed with the municipality, including amnesties and retrospective approvals.
- Land-registry compliance: check that the floor plan and land-registry data match the house.
- Constraints: landscape, hydrogeological and national-park constraints in the La Maddalena archipelago, and distance from the sea.
- Plot potential: whether building volume remains available, and whether extensions, changes of use or a swimming pool are possible.
- Open procedures: unresolved applications for retrospective approval, disputes, enforcement orders.
- Contract: clauses that protect the buyer if the checks reveal problems, before the deposit is paid.
Why you need a local team
None of these checks can be done properly from a distance. You need an adviser who knows the market and the history of the properties, a surveyor or architect who can read each municipality’s plans and has a working relationship with its offices, and a lawyer experienced in property and planning law to handle the contract and guarantees. They must work together, and before the preliminary contract, not after.
Knowing Italian law well is not enough. An architect from elsewhere, however skilled, may not know that swimming pools are not allowed in that zone of that municipality, and may assure the buyer that one can be built. The buyer purchases counting on that pool, and discovers it cannot be built only when the project is submitted. The same applies to an extension, a guest annex, a covered pergola or a change of use: every municipality has its own rules, and different zones of the same municipality often have different constraints.
In our experience the most expensive surprises are not about the price, but about what you can do with a house after buying it. For a foreign buyer, who often decides from afar and in a language that is not their own, having people at your side who know Sardinia’s rules is not an extra cost: it is the most important part of the investment.
Sources: Sardinia Regional Law of 22 December 1989, no. 45, art. 10-bis; Regional Landscape Plan of Sardinia (2006); Region of Sardinia policy guidance on agricultural zones, February 2024; Decree-Law of 29 May 2024, no. 69 (Salva casa); Sardinia Regional Law 18/2025; Constitutional Court, judgment of 21 May 2026, no. 86; L’Unione Sarda, 26 February 2026; La Nuova Sardegna, 8 October 2026.

